The Third Mainland Bridge

Most mornings, hundreds of thousands of Lagosians drive across the largest thing anyone has ever built in this city — and think about the traffic.

Archive footage, Lagos. Provenance and date being established — see the sources at the foot of this page.

SCROLL ↓
Station 01 · The deck

What you see is the traffic.

It starts at Oworonshoki and ends on the island, and for most of the people on it that is the entire fact of the matter. A route. Somewhere you sit.

The crossing runs for , carrying . For six years it was . It was .

None of that is secret. It is written down, it is on the signs, it is in the engineering record. It simply isn't looked at.

11.8km
The length of the crossing, according to the Institution of Civil Engineers.
A line we had to throw away

There is a thing people say about this bridge — that from the moment you join it to the moment you leave it, there is no ground under your wheels.

It is a good line and it is not true. The engineering record describes built in the lagoon where the bridge meets the interchange at Ebute Metta. Part of the crossing stands on ground that was made for it.

We wanted the line. We're telling you why you won't hear it.

Station 02 · The piers

Underneath, it is standing on stilts.

The road you drive on is not resting on the lagoon. It is resting on columns, and those columns are resting on piles driven down through soft mud until they reach something that will hold.

The record describes , carrying . That is a lot of separate holes in the bottom of a lagoon.

That is the whole engineering problem of building anything large in Lagos. Not the distance. The ground.

We have a figure for how deep those piles go. We are not printing it, because is not something we can currently attribute to anyone.

60m
The longest gap between two piers. Most of the spans are 45 metres.
45–60 m DECK · 8 LANES · 33.1 m WIDE LAGOS LAGOON TWIN CONCRETE SHAFTS LAGOON BED PILE DEPTH — NOT SOURCED
Deck, piers and spans as recorded by the Institution of Civil Engineers. The drawing fades below the lagoon bed because that is where our sourcing stops — we have a figure for how deep the piles go, and no one to attribute it to. Drawn by Sponge Media from the ICE project record
Station 03 · The lagoon bed

Why here, and why then.

A bridge is an answer to a question somebody asked at a particular moment. The question here was what to do about a city that had outgrown two crossings — the Eko and the Carter — in a decade when traffic was rising faster than anything could be built. The film at the top of this page is : cars, bicycles and people, all using the same road at once.

It was . Phase one reached the interchange at Ebute Metta and stopped. Phase two, which carried it north to Oworonshoki, did not begin for another eight years.

Nothing in the engineering record explains the gap. That silence is the most interesting thing on the page.

Hidden in plain sight

The bridge took fourteen years to build, and for eight of them, nobody built anything. Work stopped in 1980 and did not restart until 1988.

And the part the record can't settle

The bridge is sometimes called Ibrahim Babangida Boulevard, and the same engineering record that gives us those dates also says the project was started and completed by his government.

Babangida took power in 1985. Phase one began in 1976. — both statements are in the same document, and they cannot both be right.

We are not going to quietly pick the half that reads better. We are going after the commissioning record.

Every bridge is a sentence somebody wrote about the future.
Working line — Edafe Daniel Eruotor
Station 04 · The city

What grew because of it.

The bridge did what it was built to do, and then it did something else. Traffic moved. Then more people came, and the city that arrived to use it grew until the crossing was full again.

You can see Makoko from the deck. Most people do, for about four seconds, at speed. It is one of the most photographed settlements in West Africa and one of the least counted: . The absence of a number is worth saying out loud, because every figure you have ever read about it was invented by somebody.

There is now planned, on the same reasoning as this one.

The part that doesn't flatter anyone

Parts of the bridge were , after reports that the structure moved as traffic crossed it. Seven years of repairs on a road the city cannot function without.

Some observers put the vibration down to gridlock — the weight of a traffic jam sitting still on a structure designed for traffic that moves.

A piece that only admires this thing isn't worth publishing. What it cost, what it displaced, and what has been deferred goes in, or the rest of it isn't believed.

Station 05 · The decision

Who decided, and who wasn't asked.

This is the station the reporting has to earn. Not the engineering — the choosing. Who signed, who benefited, who was living on the route, and who found out when the machines arrived.

We know the client was . We do not yet know who was in the room.

Watch

You drive on this every day. But do you know what's underneath?

Forty seconds. The first film in the series, and the shortest version of everything below.

Made and paid for by Sponge Media. No sponsor on this film or this page.

Keep reading

Get the next one before anyone else.

One email when a new piece goes up. The working, the sources, and what we couldn't stand up. No more than that.

Subscribe on Substack

Free. Unsubscribe any time. We don't sell or share the list.

Where all of this came from

Every claim in the piece, with its source and its status. Nothing hidden in a footnote, including the things we haven't nailed down yet.

01
11.8 kilometresverified
Institution of Civil Engineers · Accessed 26 August 2026
"At 11.8km long, it's the longest of three road bridges crossing Lagos Lagoon." ICE project record for the Third Mainland Bridge.
https://www.ice.org.uk/what-is-civil-engineering/infrastructure-projects/third-mainland-bridge-lagos ↗
02
eight lanes across 33.1 metresverified
Institution of Civil Engineers · Accessed 26 August 2026
Four lanes in each direction, overall structure width 33.1m including a 3.5m median separator.
https://www.ice.org.uk/what-is-civil-engineering/infrastructure-projects/third-mainland-bridge-lagos ↗
03
the longest bridge in Africaverified
Institution of Civil Engineers · Accessed 26 August 2026
It held the title from opening until the 20.5km 6th October Bridge in Cairo was completed in 1996.
https://www.ice.org.uk/what-is-civil-engineering/infrastructure-projects/third-mainland-bridge-lagos ↗
04
commissioned by the Ministry of Works and Transport and Lagos State Governmentverified
Institution of Civil Engineers · Accessed 26 August 2026
Client listed as Ministry of Works and Transport, Lagos State Government. Construction engineers: Julius Berger.
https://www.ice.org.uk/what-is-civil-engineering/infrastructure-projects/third-mainland-bridge-lagos ↗
05
an artificial islandverified
Institution of Civil Engineers · Accessed 26 August 2026
"Engineers constructed an artificial island in Lagos Lagoon at the point the bridge met the road interchange at Ebute Metta."
https://www.ice.org.uk/what-is-civil-engineering/infrastructure-projects/third-mainland-bridge-lagos ↗
06
two slender concrete shafts for every pierverified
Institution of Civil Engineers · Accessed 26 August 2026
"Engineers used two slender concrete shafts – or pillars – for each of the bridge's piers."
https://www.ice.org.uk/what-is-civil-engineering/infrastructure-projects/third-mainland-bridge-lagos ↗
07
spans of 45 metres, and some up to 60verified
Institution of Civil Engineers · Accessed 26 August 2026
"The project team constructed most of the bridge's spans at 45m, though some were up to 60m." A span is the distance between two piers.
https://www.ice.org.uk/what-is-civil-engineering/infrastructure-projects/third-mainland-bridge-lagos ↗
08
how deep the piles gounverified
Not sourced · Open
The film cites pile depths of 36–54 metres into the lagoon bed. The ICE record confirms the twin concrete shafts and the span lengths, but says nothing about pile depths. We have not found a citable source for that figure.
09
the traffic that caused this bridgeno link yet
Archive footage — rights holder not yet established · Date and rights holder to be confirmed
Black-and-white film of dense motor, bicycle and pedestrian traffic in Lagos. The vehicles are right-hand drive, which is the configuration Nigeria used before switching to left-hand drive on 2 April 1972. Split-screen VW Type 2 vans also point to the 1960s. That dates the film, but does not tell us who shot it or who owns it.
10
built in two phases, fourteen years apartverified
Institution of Civil Engineers · Accessed 26 August 2026
Phase one, Lagos Island to the interchange at Ebute Metta, ran 1976–1980. Phase two, north to Oworonshoki, ran 1988–1990.
https://www.ice.org.uk/what-is-civil-engineering/infrastructure-projects/third-mainland-bridge-lagos ↗
11
who started it is not settledno link yet
Institution of Civil Engineers — internally inconsistent · Accessed 26 August 2026
The same ICE record states the project was "started and completed by the government of General Ibrahim Babangida", and also that phase one ran from 1976 to 1980. Babangida took power in 1985. Both statements cannot be right.
https://www.ice.org.uk/what-is-civil-engineering/infrastructure-projects/third-mainland-bridge-lagos ↗
12
no reliable population figure existsverified
No reliable figure exists · Open
Estimates in circulation range from roughly 40,000 to over 300,000. The settlement has never been comprehensively enumerated, and figures are repeated without attribution.
13
a fourth crossingno link yet
Institution of Civil Engineers, citing BusinessDay · Accessed 26 August 2026
A 38km fourth mainland bridge, two four-lane carriageways, reported at £2.3bn and expected to open in 2027.
https://www.ice.org.uk/what-is-civil-engineering/infrastructure-projects/third-mainland-bridge-lagos ↗
14
closed for repairs between 2006 and 2013verified
Institution of Civil Engineers · Accessed 26 August 2026
"Parts of the bridge were closed for repairs between 2006 and 2013 amid reports the structure was vibrating as traffic passed over it." Some observers attributed the vibration to gridlock loading the structure.
https://www.ice.org.uk/what-is-civil-engineering/infrastructure-projects/third-mainland-bridge-lagos ↗
Reporting

Edafe Daniel Eruotor

Editorial direction

Dayo Elegbe

Design and build

Sponge Media

Funding

Sponge Media. No sponsor.

Corrections and changes
  • 26 Aug 2026 — First published.
  • 26 Aug 2026 — Length, spans, pier construction, phasing and repair history sourced to the Institution of Civil Engineers.
  • 26 Aug 2026 — The claim that no part of the crossing sits on ground is withdrawn. ICE records an artificial island at Ebute Metta.
  • 26 Aug 2026 — Pile depths of 36–54m remain unsourced and are held out of the text.
  • 26 Aug 2026 — Stock photography removed. Artwork on this page is drawn from the sourced record.